I am currently not on track to meet the deadline, as I have not met the targets on my action plan. I think I am behind because my time managing skills are not as good as they should be, and so when I should be researching or modeling in self directed time I am doing something else such as work. To make sure that I get back on schedule I will have to reduce the hours that I work, and make sure I set time aside to put in the extra effort to catch up. If I manage to do this, my time managing skills should improve and I should meet the deadline.
I have not met the all targets on my action plan by the date that id set, although the first section of research I have completed on track. In order to complete all the other sections on time and by the dates set in my action plan I will have to work extra hard to make sure I get them finished. I still have a lot to do before I have finished the project; I have half my research still left to do, all the modeling and the scripting. However the modeling I hope to have finished within two weeks and the scripting shouldn't take much longer as I have a lot of scripts from old projects that I can use in this project.
I have thought about changing my project, but because I like the idea that I’ve chosen so much I think that I will just scale down the project, such as making the model of the Colosseum less detailed and use one model for the players but just use different textures. At the moment it is hard to say whether I like my work or think that it is a good standard because I haven't done a lot, although I know if I put the effort in I can produce some good models. I feel like I will work better my setting time aside for the research and just get on with the modeling and scripting because I enjoy doing these the most. I’m not happy with the stage that I’m at in this project, although I think I can get it finished on time.
No comments:
Post a Comment